Project timeline
Project Donors
Mystic Portal is an expert-level downhill-only track. It is basically one line in three sections, and the middle jump section was refreshed in 2025.
The middle section is 2-3m wide, allowing for dual take-offs for each feature: one steeper, poppier take-off over gaps and the other side being mellower with case pads.
Total Trail Solutions was the contractor for the rebuild, working with Mystic Portal Trail Builders for the design of the features. The community funded this refresh through Trails Wellington.
On-going maintenance will be with Mystic Portal Trail Builders.
Mystic Portal is an expert-level downhill-only track. It is basically one line in three sections, and the middle jump section was refreshed in 2025.
The middle section is 2-3m wide, allowing for dual take-offs for each feature: one steeper, poppier take-off over gaps and the other side being mellower with case pads.
Total Trail Solutions was the contractor for the rebuild, working with Mystic Portal Trail Builders for the design of the features. The community funded this refresh through Trails Wellington.
On-going maintenance will be with Mystic Portal Trail Builders.
Got the time? Then Check out ...

Contribute as a guest writer
Share your passion, views and stories with fellow locals and adventure-seeking visitors. Whether it's trail tips, build stories, or something you need us all to laugh about, or think about. Your voice belongs on the map.